top of page

EPDM POUR-N-PLACE EDGE DETAILS

Installation Process : The pictures below show the steps of the installation process. The base mat is applied in a thickness appropriate for the fall height if the equipment. Ten a 1/2" cap of EPDM is applied over the base mat for the finished surface. 

Contact Details:

Office Hours

Mon - Fri

Saturday

​Sunday

8:00 am – 5:00 pm

Closed

Closed

©2021 by Malihesa Surfacing
bottom of page